PPJ #2: Nelly
Nelly Duke PPJ #2 (April 25, 2024)
Tasks Completed:
Brainstorming with group (1 hour)
Fixing issues with git (0.5 hours)
Initiated a transfer to a Gitlab repo to create a ticketing system (1 hour)
Worked creating some concepts for 2d sprites (1.5 hours)
Total number of hours: 4
Positive: This week I feel our team got a lot done, I've really enjoyed the concept art shown and the brainstorming our team has done. It seems like everyone has really found their niche and is producing great work.
Negative: I wasted a lot of time this week on non-final things, for example I wasn't entirely happy with the 2d sprite concept work I was doing however the work I did do helped me learn how to use the software better.
Upcoming: This week was a lot of administrative stuff for me, I really want to tackle actual coding next.